Soitec Solar Development Revised Final Program EIR

LOG NO. PDS2012-3910-120005 (ER); 3800-12-010 (GPA); TIERRA DEL SOL, 3300-12-010 (MUP); 3600-12-005 (REZ); 3921-77-046-01 (AP); RUGGED SOLAR, 3300-12-007 (MUP); SCH NO. 2012121018  

Project Contact: Ashley Smith -Ashley.Smith2@sdcounty.ca.gov  (858) 495-5375

 

REVISED FINAL PROGRAM ENVIRONMENTAL IMPACT REPORT

COVER, TABLE OF CONTENTS, ACRONYMS, ABBREVIATIONS AND GLOSSARY OF TERMS 

PREFACE 

ADDITIONAL INFORMATION STATEMENT (Part: 1 2 3 4 )  

SUMMARY 

CHAPTER 1.0   PROJECT DESCRIPTION, LOCATION, AND ENVIRONMENTAL SETTING  (Part: 1 2 3

CHAPTER 2.0   SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT

CHAPTER 3.0   EFFECTS NOT FOUND TO BE SIGNIFICANT

CHAPTER 4.0   PROJECT ALTERNATIVES

CHAPTER 5.0    REFERENCES

CHAPTER 6.0    LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED

CHAPTER 7.0    LIST OF MITIGATION MEASURES / ENVIRONMENTAL DESIGN CONSIDERATIONS

CHAPTER 8.0    OTHER CEQA CONSIDERATIONS

CHAPTER 9.0    RESPONSE TO COMMENTS

Index of Copyrighted References 

  • References

3.1.1-1    LARA Model Results Report

3.1.1-2    Agricultural Preserve Disestablishment Report

3.1.3-1    Greenhouse Gas Technical Report for the Tierra del Sol Solar Farm Project

3.1.3-2    Greenhouse Gas Technical Report for the Rugged Solar Farm Project

3.1.3-3    AB 900 Application for the  Soitec Solar Energy Project

3.1.4-1a   Phase I Environmental Site Assessment for the Tierra del Sol Solar Farm Project   (Parts: 1 2)  

3.1.4-1b   Limited Phase II Environmental Site Assessment for the Tierra del Sol Solar Farm Project

3.1.4-1c   Phase I Environmental Site Assessment Generator Tie Transmission Line for the Tierra del Sol Solar Farm Project (Parts: 1 2 )

3.1.4-2    Phase I Environmental Site Assessment for the Rugged Solar Farm Project

3.1.4-3    Phase I Environmental Site Assessment for the LanEast Solar Farm Project

3.1.4-4    Phase I Environmental Site Assessment for the LanWest Solar Farm Project

3.1.4-5    Draft Fire Protection Plan for the Tierra del Sol Solar Farm Project  (Parts: 1 2 3 4 5 6 ) 

3.1.4-6    Draft Fire Protection Plan for the Rugged Solar Farm Project  (Parts: 1 2 3 4 5 6 )

3.1.4-7    Construction Fire Prevention Protection Plan Outline

3.1.5-1    Preliminary Hydrology and Drainage Study for the Tierra del Sol Solar Farm Project

3.1.5-2    Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (Parts: 1 2 3 4 ) 

3.1.5-3a   Minor Stormwater Management Plan for the Tierra del Sol Solar Farm Project

3.1.5-3b   Minor Stormwater Management Plan for the Tierra del Sol Solar Farm Project (Gen-Tie)

3.1.5-4    Minor Stormwater Management Plan for the Rugged Solar Farm Project

3.1.5-5    Groundwater Resources Investigation Report  for the Tierra del Sol Solar Farm Project
(Parts:
1 2 3 4 5 6 7 8 9 10 )

3.1.5-6    Groundwater Resources Investigation Report  for the Rugged Solar Farm Project  (Parts: 1 2 3)

3.1.5-7    Groundwater Resources Investigation Report for the Pine Valley Mutual Water Company

3.1.5-8    Jacumba Groundwater Resource Investigation Report  (Parts: 1 2 )

3.1.7-1    Emergency Service Capabilities Assessment and Cumulative Impact Mitigation