Soitec Solar Development Final Program EIR

LOG NO. PDS2012-3910-120005 (ER); 3800-12-010 (GPA); TIERRA DEL SOL, 3300-12-010 (MUP); 3600-12-005 (REZ); 3921-77-046-01 (AP); RUGGED SOLAR, 3300-12-007 (MUP); SCH NO. 2012121018  

Project Contact: Ashley Smith -Ashley.Smith2@sdcounty.ca.gov  (858) 495-5375

 

The Soitec Solar Development Draft Program EIR was advertised for public review from January 2, 2014 to March 3, 2014.  During the public review period of the Draft Program EIR, a total of 143 comment letters as well as 141 postcards were received.  Responses to comments received during the public review period can be found in the Soitec Solar Development Final Program EIR below.

Soitec Solar Development Draft Program EIR and Administrative Record

Planning Report for Board of Supervisors February 4th 2015
    Final BL Soitec Solar Development REVISED.sig
   
A.    Planning Commission Hearing Report
    B.    Planning Documentation
    C.    Resolution Approving PDS2012-77-046-01
    D.    Ordinance Approving PDS2012-3600-12-005
    E.    Form of Decision Approving PDS2012-3300-12-010
    F.    Form of Decision Approving PDS2012-3300-12-007
    G.    Rugged Solar Fire and Emergency Services Agreement
    H.    Tierra Del Sol Solar Fire and Emergency Services Agreement
    I.    Franchise Agreement
    J.    Environmental Documentation
    K.    Environmental Findings
    L.    Public Documentation
    M.    Ownership Disclosure
    N.    Post Planning Commission Changes
    O.    Draft Defense and Indemnification Agreement

Planning Commission Hearing Report 1-16-2015

Rugged Solar Plot Plan
Rugged Solar Preliminary Grading Plan
Tierra Del Sol Solar Plot Plan
Tierra Del Sol Solar Preliminary Grading Plan

 

FINAL PROGRAM ENVIRONMENTAL IMPACT REPORT

Soitec Solar FPEIR Notice Of Determination 
(approved by the Board of Supervisors on February 4, 2015)

Final Program EIR Errata

COVER

TABLE OF CONTENTS

ACRONYMS, ABBREVIATIONS AND GLOSSARY OF TERMS

PREFACE

ADDITIONAL INFORMATION STATEMENT (Part: 1    2    3    4    5 )

SUMMARY

CHAPTER 1.0   PROJECT DESCRIPTION, LOCATION, AND ENVIRONMENTAL SETTING  
(Part:    1    2    3    4    5    6    7

CHAPTER 2.0   SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT

CHAPTER 3.0   EFFECTS NOT FOUND TO BE SIGNIFICANT

CHAPTER 4.0   PROJECT ALTERNATIVES (Part: 1    2 )

CHAPTER 5.0   REFERENCES

CHAPTER 6.0   LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED

CHAPTER 7.0   LIST OF MITIGATION MEASURES / ENVIRONMENTAL DESIGN CONSIDERATIONS

CHAPTER 8.0    OTHER CEQA CONSIDERATIONS

CHAPTER 9.0    RESPONSE TO COMMENTS

Index of Copyrighted References 

3.1.1-1    LARA Model Results Report

3.1.1-2    Agricultural Preserve Disestablishment Report

3.1.3-1    Greenhouse Gas Technical Report for the Tierra del Sol Solar Farm Project

3.1.3-2    Greenhouse Gas Technical Report for the Rugged Solar Farm Project

3.1.3-3    AB 900 Application for the  Soitec Solar Energy Project

3.1.4-1a   Phase I Environmental Site Assessment for the Tierra del Sol Solar Farm Project    
                (1 of 2)    
 (2 of 2)

3.1.4-1b   Limited Phase II Environmental Site Assessment for the Tierra del Sol Solar Farm Project

3.1.4-1c   Phase I Environmental Site Assessment Generator Tie Transmission Line for the Tierra del Sol Solar Farm Project (1 of 2)

3.1.4-1c   Phase I Environmental Site Assessment Generator Tie Transmission Line for the Tierra del Sol Solar Farm Project (2 of 2)

3.1.4-2    Phase I Environmental Site Assessment for the Rugged Solar Farm Project

3.1.4-3    Phase I Environmental Site Assessment for the LanEast Solar Farm Project

3.1.4-4    Phase I Environmental Site Assessment for the LanWest Solar Farm Project

3.1.4-5    Draft Fire Protection Plan for the Tierra del Sol Solar Farm Project
(1 of 9)
   (2 of 9)  (3 of 9)  (4 of 9)  (5 of 9)  (6 of 9)  (7 of 9)  (8 of 9)  (9 of 9)

3.1.4-6    Draft Fire Protection Plan for the Rugged Solar Farm Project
(1 of 6)
 (2 of 6)  (3 of 6)  (4 of 6)  (5 of 6)  (6 of 6)

3.1.4-7    Construction Fire Prevention Protection Plan Outline

3.1.5-1    Preliminary Hydrology and Drainage Study for the Tierra del Sol Solar Farm Project

3.1.5-2    Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (1 of 4)

3.1.5-2    Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (2 of 4)

3.1.5-2    Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (3 of 4)

3.1.5-2    Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (4 of 4)

3.1.5-3a   Minor Stormwater Management Plan for the Tierra del Sol Solar Farm Project

3.1.5-3b   Minor Stormwater Management Plan for the Tierra del Sol Solar Farm Project (Gen-Tie)

3.1.5-4    Minor Stormwater Management Plan for the Rugged Solar Farm Project