Soitec Solar Development Final Program EIR
LOG NO. PDS2012-3910-120005 (ER); 3800-12-010 (GPA); TIERRA DEL SOL, 3300-12-010 (MUP); 3600-12-005 (REZ); 3921-77-046-01 (AP); RUGGED SOLAR, 3300-12-007 (MUP); SCH NO. 2012121018
Project Contact: Ashley Smith -Ashley.Smith2@sdcounty.ca.gov (858) 495-5375
The Soitec Solar Development Draft Program EIR was advertised for public review from January 2, 2014 to March 3, 2014. During the public review period of the Draft Program EIR, a total of 143 comment letters as well as 141 postcards were received. Responses to comments received during the public review period can be found in the Soitec Solar Development Final Program EIR below.
Soitec Solar Development Draft Program EIR and Administrative Record
Planning Report for Board of Supervisors February 4th 2015
Final BL Soitec Solar Development
REVISED.sig
A. Planning Commission Hearing Report
B. Planning Documentation
C. Resolution Approving
PDS2012-77-046-01
D. Ordinance Approving
PDS2012-3600-12-005
E. Form of Decision Approving
PDS2012-3300-12-010
F. Form of Decision Approving
PDS2012-3300-12-007
G. Rugged Solar Fire and Emergency Services
Agreement
H. Tierra Del Sol Solar Fire and Emergency
Services Agreement
I. Franchise Agreement
J. Environmental Documentation
K. Environmental Findings
L. Public Documentation
M. Ownership Disclosure
N. Post Planning Commission Changes
O. Draft Defense and Indemnification Agreement
Planning Commission Hearing Report
1-16-2015
Rugged Solar Plot Plan
Rugged Solar Preliminary Grading Plan
Tierra Del Sol Solar Plot Plan
Tierra Del Sol Solar Preliminary Grading Plan
FINAL PROGRAM ENVIRONMENTAL IMPACT REPORT
Soitec Solar FPEIR Notice Of Determination
(approved by the Board of Supervisors on February 4, 2015)
ACRONYMS, ABBREVIATIONS AND GLOSSARY OF TERMS
ADDITIONAL INFORMATION STATEMENT (Part: 1 2 3 4 5 )
CHAPTER 1.0 PROJECT DESCRIPTION, LOCATION, AND ENVIRONMENTAL
SETTING
(Part: 1 2 3 4 5 6 7 )
CHAPTER 2.0 SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT
- 2.1 Aesthetics
- 2.2 Air Quality
- 2.3 Biological Resources (Part: 1 2 3 )
- 2.4 Cultural Resources
- 2.5 Land Use and Planning
-
2.6 Noise (Part:
1
2 3 4 5 )
CHAPTER 3.0 EFFECTS NOT FOUND TO BE SIGNIFICANT
- 3.1 Effects Found Not Significant as Part of the EIR Process
- 3.1.1 Agriculture and Forestry Resources
- 3.1.2 Geology, Soils, and Seismicity
- 3.1.3 Greenhouse Gas Emissions
- 3.1.4 Hazards And Hazardous Materials (Part: 1 2 )
- 3.1.5 Hydrology and Water Quality (Part: 1 2 3 )
- 3.1.6 Paleontological Resources
- 3.1.7 Public Services
- 3.1.8 Transportation and Traffic
- 3.1.9 Utilities and Service Systems
- 3.2 Effects Found Not Significant During Initial Study
CHAPTER 4.0 PROJECT ALTERNATIVES (Part: 1 2 )
CHAPTER 6.0 LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED
CHAPTER 7.0 LIST OF MITIGATION MEASURES / ENVIRONMENTAL DESIGN CONSIDERATIONS
CHAPTER 8.0 OTHER CEQA CONSIDERATIONS
APPENDICES
1.0-2 Public Resources Code Sections 21178-21189.3
2.1-1 Visual Resources Report for the Tierra del Sol Solar Farm Project
2.1-2 Visual Resources Technical Report for the Rugged Solar LLC Project
2.1-3 Boulevard Glare Study (1 of 6)
2.1-3 Boulevard Glare Study (2 of 6)
2.1-3 Boulevard Glare Study (3 of 6)
2.1-3 Boulevard Glare Study (4 of 6)
2.1-3 Boulevard Glare Study (5 of 6)
2.1-3 Boulevard Glare Study (6 of 6)
2.1-4 Landscape Screen Design for the Soitec Solar Development Program EIR
2.2-1 Air Quality Technical Report for the Tierra del Sol Solar Farm Project
2.2-2 Air Quality Technical Report for the Rugged Solar Farm Project
2.3-1 Biological Resources Report for the Tierra
del Sol Solar Farm
Project (1 of 3)
2.3-1 Biological Resources Report for the Tierra
del Sol Solar Farm
Project (2 of 3)
2.3-1 Biological Resources Report for the Tierra
del Sol Solar Farm
Project (3 of 3)
2.3-2 Biological Technical Report for the Rugged Solar Farm Project
2.3-3 Quino Checkerspot Butterfly 45-Day Summary Report for the LanEast Solar Farm Project
2.3-4 Biological Resources Report for the LanWest Solar Farm Project (1 of 2)
2.3-4 Biological Resources Report for the LanWest Solar Farm Project (2 of 2)
2.3-5 Cumulative Impacts: Potentially Impacted Special-Status Plant Species
2.3-6 Evaluation of Biological Resources for the Soitec Mitigation Site Memorandum
2.4-1 Archaeological Survey and Evaluation for the Tierra del Sol Solar Farm Project
2.4-2 Archaeological Evaluation for the Rugged Solar Farm Project
2.4-3 Cultural Resources Survey Report for the LanEast Solar Farm Project
2.4-4 Cultural Resources Survey Report for the LanWest Solar Farm Project
2.5-1 General Plan Analysis Report Tierra del Sol Solar Farm Project
2.5-2 General Plan Analysis Report Rugged Solar Farm Project
2.6-1 Acoustical Assessment Report for the Tierra del Sol Solar Farm Project
2.6-2 Acoustical Assessment Report for the Rugged Solar Farm Project
3.1.1-1 LARA Model Results Report
3.1.1-2 Agricultural Preserve Disestablishment Report
3.1.3-1 Greenhouse Gas Technical Report for the Tierra del Sol Solar Farm Project
3.1.3-2 Greenhouse Gas Technical Report for the Rugged Solar Farm Project
3.1.3-3 AB 900 Application for the Soitec Solar Energy Project
3.1.4-1a Phase I Environmental Site Assessment for
the Tierra del Sol Solar Farm Project
(1
of 2) (2 of 2)
3.1.4-1b Limited Phase II Environmental Site Assessment for the Tierra del Sol Solar Farm Project
3.1.4-2 Phase I Environmental Site Assessment for the Rugged Solar Farm Project
3.1.4-3 Phase I Environmental Site Assessment for the LanEast Solar Farm Project
3.1.4-4 Phase I Environmental Site Assessment for the LanWest Solar Farm Project
3.1.4-5 Draft Fire Protection Plan for the Tierra
del Sol Solar Farm Project
(1 of 9) (2 of 9) (3 of 9) (4 of 9) (5 of 9) (6 of 9) (7 of 9) (8 of 9) (9 of 9)
3.1.4-6 Draft Fire Protection Plan for the Rugged
Solar Farm Project
(1 of 6) (2 of 6) (3 of 6) (4 of 6) (5 of 6) (6 of 6)
3.1.4-7 Construction Fire Prevention Protection Plan Outline
3.1.5-1 Preliminary Hydrology and Drainage Study for the Tierra del Sol Solar Farm Project
3.1.5-2 Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (1 of 4)
3.1.5-2 Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (2 of 4)
3.1.5-2 Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (3 of 4)
3.1.5-2 Preliminary Hydrology and Drainage Study for the Rugged Solar Farm Project (4 of 4)
3.1.5-3a Minor Stormwater Management Plan for the Tierra del Sol Solar Farm Project
3.1.5-3b Minor Stormwater Management Plan for the Tierra del Sol Solar Farm Project (Gen-Tie)
3.1.5-4 Minor Stormwater Management Plan for the Rugged Solar Farm Project
3.1.5-5 Groundwater Resources Investigation
Report for the Tierra del Sol Solar Farm Project
(1 of 8) (2 of 8) (3 of 8) (4 of 8) (5 of 8) (6 of 8) (7 of 8) (8 of 8)
3.1.5-6 Groundwater Resources Investigation Report for the Rugged Solar Farm Project
3.1.5-7 Groundwater Resources Investigation Report for the Pine Valley Mutual Water Company
3.1.5-8 Jacumba Groundwater Resource Investigation Report (1 of 2) (2 of 2)
3.1.7-1 Emergency Service Capabilities Assessment and Cumulative Impact Mitigation
4.0-1 Evaluation of Biological Resources for the Soitec Mitigation Site
9.0-4 Review of Bat Data Related to Soitec Boulevard Portfolio
9.0-5 Supplemental Air Quality Analysis – Project Changes
9.0-6 20% Contingency for Operational Water Demand – Revised Analysis
Groundwater Mitigation and Monitoring Plans:
FINAL Groundwater Monitoring and Mitigation Plan - Jacumba Community Services District
FINAL Groundwater Monitoring and Mitigation Plan - Pine Valley Mutual Water Company
FINAL Groundwater Monitoring and Mitigation Plan - Rugged
FINAL Groundwater Monitoring and Mitigation Plan - Tierra Del Sol