Performing pilot studies on new and innovative resurfacing products to evaluate their local use is one of the goals of the Building Better Roads Working Group.  As these pilot studies progress information provided below will be updated.   Click on an individual pilot study below to learn more.

Expand All | Collapse All

  • P-1 Fiber Reinforced Asphalt Concrete

    Summary-  Adding fiber reinforcement to asphalt concrete creates a 3-dimensional matrix designed to resist reflective cracking and prevent rutting.   This study will evaluate and compare fiber reinforced asphalt concrete to conventional/ polymer modified asphalt concrete on both a performance and cost basis to determine if continued use as part of the County’s resurfacing program is warranted.

    Status- Construction on this project was completed on May 25th,2021. This project is currently in the evaluation phase. The last evaluation (24 month) was conducted in Spring 2023.  The next evaluation (36 month) will occur in Spring 2024.  Moving forward evaluations will take place annually.  Annual evaluations will occur for 5-7 years post construction

    Work Plan-24 Months

    Work Plan Attachment - 1- HMA Specification

    Work Plan Attachment -2- HMA Mix Design

    Work Plan Attachment -3- HMA Test Results

  • P-2 100% RAP Pavement Seals

    Summary- This pilot will evaluate the performance of  both 100% RAP chip and slurry seals compared to conventional control sections, to identify methods to reduce the use of virgin aggerate.

    Status- In Construction as part of the FY 21-22 annual resurfacing projects.  Construction expected to be complete by early summer 2023.

    Work Plan