Valley Center Road Corridor Concept Plan 2023 Options

New Options and Citygate Report

In response to the input received on the 2022 Draft Valley Center Road Corridor Concept Plan (VCRCCP), additional roadway configuration options and supplemental analysis are available for review (see links below). The project team welcomes all input and recommendations. Please see the contact information below. 

To analyze the new options for emergency response and evacuation considerations, Citygate Associates (Citygate) joined the project team in early 2023. Citygate has conducted an analysis and prepared a detailed report. The author, Stewart Gary, is a retired Fire Chief with extensive experience in emergency response planning and analysis, including preparation of the 2017 Standards of Coverage Study for the Valley Center Fire Protection District (VCFPD). The Citygate Report has been reviewed for concurrence by the VCFPD Chief, County Fire Protection District, County Sheriff, and California Highway Patrol, and is now available for public review.

For any questions, comments, translation assistance, or to set up a meeting with members of the project team, please contact Kevin Johnston at Kevin.Johnston@sdcounty.ca.gov, or (619) 458-2473; or the project email address or phone line at PDS.CommunityPlanUpdates@sdcounty.ca.gov , or (858) 505-6677.

Option A
Option C
Option B

Citygate Report Links

Citygate Report

Citygate Exhibits (referenced in the Citygate Report)

New CCP Options Links

New CCP Option A - Full Corridor Plan Sheet & Zoomed In Plan Sheets

New CCP Option B – Full Corridor Plan Sheet & Zoomed In Plan Sheets

New CCP Option C – Full Corridor Plan Sheet

Note: Option C is also referred to as the “No Roundabouts” Option and includes all components of Option B except signals where Option B shows roundabouts.

Summary of New CCP Options & Intersection Performance Tables

 

 

CityGate Report Cover Page