General Plan Update Environmental Review

General Plan Update - Final Program EIR

The County of San Diego Board of Supervisors certified the Final Program Environmental Impact Report (EIR) for the General Plan Update and adopted the update to the General Plan on August 3, 2011.  The Board of Supervisors adopted the alternative titled "The Recommended Project" as described in Volume IV of the Final Program EIR.  Please use the following links to access the Final Certified Program EIR.

EIR Volume I 

Cover, Table of Contents, List of Acronyms

Summary

Chapter 1: Project Description, Location, and Environmental Setting

Chapter 2: Environmental Effects of the Proposed Project

Chapter 3: Other CEQA Considerations

Chapter 4: Project Alternatives

Chapter 5: References

Chapter 6: Preparers and Persons Contacted

Chapter 7: Proposed General Plan Update Policies and Mitigation Measures

EIR Volume II

EIR Volume II – Technical Appendices to the EIR

Appendix A: NOP, Comments Received on the NOP, and Materials from the Scoping Meeting (18 mb)

Appendix B: Air Quality Technical Report

Appendix C: Biological Resources Tables

Appendix D: Groundwater Study (53 mb)

    Groundwater Study Appendices (10 mb)

Appendix E: Proposed Road Construction/Widening Table

Appendix F: Noise Technical Report

Appendix G: Traffic and Circulation Assessment

Appendix H: Traffic Impacts to Adjacent City Jurisdiction Report

Appendix I: Rationale for Accepting Roadways with Level of Service E/F

Appendix J: Single Year, Normal-Year and Multiple Dry Water Year UWMP Supply and Demand Assessments

Appendix K: Greenhouse Gas Emissions Inventory

Appendix L: Project Alternatives Areas of Difference (215 mb) 

Appendix M: Environmentally Superior Map Comparison to Referral Map

EIR Volume III

EIR Volume III – Summary of Changes to the Draft EIR, List of Commenters, Comment Letters and Responses to Comments on the Draft EIR

Summary of Changes to the Draft EIR

Comment Letters, and Responses to Comments on the Draft EIR

EIR Volume IV  

EIR Volume IV – Amendment to the EIR: Description and Analysis of the Recommended Project

Appendix A: General Plan Update Text, Goals, and Policies Differences Recommended to Proposed Project

Appendix B: Land Use Map Differences Recommended Project to Proposed Project

Appendix C: Areas of Difference - Recommended Project (22 mb)

Appendix D: General Plan Update Mobility Element Road Network Differences - Recommended to Proposed Project

Appendix E: Technical Memorandum: County General Plan Update - Recommended Project Alternative (Traffic Model Results)

Appendix F: Impacted Roadway Segments and Supporting Rationale for LOS E/F Level Acceptance

 

General Plan Update – Draft EIR 

Public Review of the Draft Program EIR for the General Plan Update took place from July 1, 2009 through August 31, 2009 and consisted of Volumes 1 and 2.  Please use the following links to access the Draft public-review version of the EIR.

Public review version as circulated on July 1, 2009

DEIR Volume I – Draft Program EIR

Cover, Table of Contents, List of Acronyms

Summary

Chapter 1: Project Description, Location, and Environmental Setting

Chapter 2: Environmental Effects of the Proposed Project

Chapter 3: Other CEQA Considerations

Chapter 4: Project Alternatives

Chapter 5: References

Chapter 6: Preparers and Persons Contacted

Chapter 7: Proposed General Plan Update Policies and Mitigation Measures

DEIR Volume II

EIR Volume II – Technical Appendices to the EIR

Appendix A: NOP, Comments Received on the NOP, and Materials from the Scoping Meeting (18 mb)

Appendix B: Air Quality Technical Report

Appendix C: Biological Resources Tables

Appendix D: Groundwater Study (53 mb)

     Groundwater Study Appendices (10 mb)

Appendix E: Proposed Road Construction/Widening Table

Appendix F: Noise Technical Report

Appendix G: Traffic and Circulation Assessment

Appendix H: Traffic Impacts to Adjacent City Jurisdiction Report

Appendix I: Rationale for Accepting Roadways with Level of Service E/F

Appendix J: Single Year, Normal-Year and Multiple Dry Water Year UWMP Supply and Demand Assessments

Appendix K: Greenhouse Gas Emissions Inventory

Appendix L: Project Alternatives Areas of Difference (215 mb) 

Appendix M: Environmentally Superior Map Comparison to Referral Map

CBI Report