General Plan Update Environmental Review
General Plan Update - Final Program EIR
The County of San Diego Board of Supervisors certified the Final Program Environmental Impact Report (EIR) for the General Plan Update and adopted the update to the General Plan on August 3, 2011. The Board of Supervisors adopted the alternative titled "The Recommended Project" as described in Volume IV of the Final Program EIR. Please use the following links to access the Final Certified Program EIR.
EIR Volume I
Cover, Table of Contents, List of Acronyms
Chapter 1: Project Description, Location, and Environmental Setting
Chapter 2: Environmental Effects of the Proposed Project
- 2.1 Aesthetics
- 2.2 Agricultural Resources
- 2.3 Air Quality
- 2.4 Biological Resources
- 2.5 Cultural and Paleontological Resources
- 2.6 Geology and Soils
- 2.7 Hazards and Hazardous Materials
- 2.8 Hydrology and Water Quality (9 mb)
- 2.9 Land Use
- 2.10 Mineral Resources
- 2.11 Noise
- 2.12 Population and Housing
- 2.13 Public Services
- 2.14 Recreation
- 2.15 Transportation and Traffic
- 2.16 Utilities and Service Systems
- 2.17 Global Climate Change
Chapter 3: Other CEQA Considerations
Chapter 4: Project Alternatives
Chapter 6: Preparers and Persons Contacted
Chapter 7: Proposed General Plan Update Policies and Mitigation Measures
EIR Volume II
EIR Volume II – Technical Appendices to the EIR
Appendix A: NOP, Comments Received on the NOP, and Materials from the Scoping Meeting (18 mb)
Appendix B: Air Quality Technical Report
Appendix C: Biological Resources Tables
Appendix D: Groundwater Study (53 mb)
Groundwater Study Appendices (10 mb)
Appendix E: Proposed Road Construction/Widening Table
Appendix F: Noise Technical Report
Appendix G: Traffic and Circulation Assessment
Appendix H: Traffic Impacts to Adjacent City Jurisdiction Report
Appendix I: Rationale for Accepting Roadways with Level of Service E/F
Appendix J: Single Year, Normal-Year and Multiple Dry Water Year UWMP Supply and Demand Assessments
Appendix K: Greenhouse Gas Emissions Inventory
Appendix L: Project Alternatives Areas of Difference (215 mb)
Appendix M: Environmentally Superior Map Comparison to Referral Map
EIR Volume III
Summary of Changes to the Draft EIR
Comment Letters, and Responses to Comments on the Draft EIR
- Communities
- Interest Group (62 mb)
- Individuals (87 mb)
- Local Agencies (21 mb)
- Organizations (33 mb)
- State Agencies
- Tribes
- Late Letters (20 mb)
EIR Volume IV
EIR Volume IV – Amendment to the EIR: Description and Analysis of the Recommended Project
Appendix B: Land Use Map Differences Recommended Project to Proposed Project
Appendix C: Areas of Difference - Recommended Project (22 mb)
Appendix F: Impacted Roadway Segments and Supporting Rationale for LOS E/F Level Acceptance
General Plan Update – Draft EIR
Public Review of the Draft Program EIR for the General Plan Update took place from July 1, 2009 through August 31, 2009 and consisted of Volumes 1 and 2. Please use the following links to access the Draft public-review version of the EIR.
Public review version as circulated on July 1, 2009