110204 Planning Commission Hearing

February 4, 2011

Agenda

Action Sheet

Audio #1 

Audio #2 

Recap: Planning Commission's 6-1 vote recommends Board of Supervisors approve 521-home, 230 multi-family residence, mixed-use Campus Park project in Fallbrook, with recommendations

Final Environmental Impact Report for Campus Park Master Planned Community

TABLE OF CONTENTS

FINAL EIR INTRODUCTION

SUMMARY

1.0 PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING

2.0 SIGNIFICANT ENVIRONMENTAL EFFECTS THAT CANNOT BE AVOIDED IF THE PROPOSED PROJECT IS IMPLEMENTED

    2.2 Transportation/Traffic

    2.3 Air Quality

3.0 SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT THAT CAN BE MITIGATED

    3.1 Noise

    3.2 Geology/Paleontology

    3.3 Biological Resources

    3.4 Cultural Resources

4.0 ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT

5.0 ALTERNATIVES TO THE PROPOSED PROJECT

6.0 LIST OF REFERENCES

7.0 LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED

8.0 LIST OF MITIGATION MEASURES AND ENVIRONMENTAL DESIGN CONSIDERATIONS        

APPENDICES

Appendix A: Notice of Preparation (NOP) and Comments on the NOP

Appendix B: Visual Impact Analysis

Appendix C: Traffic Impact Study

    Traffic Tech Reports

Appendix D: Air Quality Technical Report - Global Climate Change Evaluation

Appendix E: Preliminary Noise Analysis

Appendix F: Geotechnical Assessment - Paleontological Resource Assessment

Appendix G: Biological Technical Report - Resource Management Plan - Conceptual Enhancement Plan - Conceptual Revegetation Plan

Appendix H: Cultural Resource Surveys

Appendix I: Water System Analysis - Sewer Service Analysis - Water Supply Assessment and Verification Report - Ten Percent Design Report for Lift Station - Project Facility Availability Forms - Contact Information                     

Appendix J: Conceptual Fire Protection Plan/Fuel Modification Plan

    Revised FPP Tech Report 1/21/11

Appendix K: Mineral Resource Technical Report

Appendix L: Preliminary Hydrology and Hydraulics Study - Storm Water Management Plan - Preliminary Hydromodification Management Plan - Nitrate Report

     Parts 1 2

Appendix M: Phase I Environmental Site Assessment and Limited Chemical Residue Survey - Well Destruction Permit - Hazardous Materials Questionnaire

Campus Park Specific Plan Amendment & General Plan Amendment Report

Appendix A: Land Use Plans and Policies Consistency Evaluation

Appendix B: Proposed Edits to Fallbrook Community Plan

Appendix C: Proposed Edits to I-15 Corridor Subregional Plan

Appendix D: Proposed Edits to Interstate 15 / Highway 76 Interchange Master Specific Plan

Appendix E: 1000 Scale Vicinity Map

Appendix F: Service District letters

Appendix G: County of San Diego Zoning Ordinance Summary

Graphics

Campus Park Grading Plans

Multifamily-1 Architectural Plans

Multifamily-1 Landscape Plans

Multifamily-1 Open Space Exhibit

Multifamily-1 Rec Building Plans

Multifamily-1 Site Plans

Multifamily-2 Architectural Plans

Multifamily-2 Landscape Plans

Multifamily-2 Open Space Exhibit

Multifamily-2 Site Plans

Professional Office Architectural Plans

Professional Office Landscape Plans

Professional Office Site Plans

Single Family Architectural Plans 1 of 3

Single Family Architectural Plans 2 of 3

Single Family Architectural Plans 3 of 3

Single Family Landscape Plans

Single Family Site Plans

Sport Complex Architectural Plans

Sport Complex Landscape Plans

Sport Complex Site Plans

Town Center Commercial Architectural Plans

Town Center Commercial Landscape Plans

Town Center Commercial Site Plans

Vesting Tentative Map