110812 Planning Commission Hearing

August 12, 2011

Agenda

Action Sheet

Audio 

 

NRG Solar Borrego One Major Use Permit

Final Environmental Impact Report for Meadowood Project: SP04-001; GPA04-002; R04-004; TM5354; S04-005, S04-006, S04-007; P08-023

TABLE OF CONTENTS

LIST OF ACRONYMS

EXECUTIVE SUMMARY

LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC AGENCIES THAT COMMENTED ON THE DRAFT ENVIRONMENTAL IMPACT REPORT (EIR)

RESPONSE TO COMMENTERS

STATEMENT OF LOCATION AND CUSTODIAN OF DOCUMENTS OR OTHER MATERIALS THAT CONSTITUTE A RECORD OF PROCEEDINGS

CHAPTERS 

1.0 PROJECT DESCRIPTION, LOCATION, AND ENVIRONMENTAL SETTING

2.0 SIGNIFICANT ENVIRONMENTAL EFFECTS WHICH CANNOT BE AVOIDED IF THE PROPOSED PROJECT IS IMPLEMENTED

    2.1 Aesthetics

    2.2 Air Quality (including Global Climate Change)

    2.3 Transportation/Traffic

3.0 SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT WHICH CAN BE MITIGATED

    3.1 Biological Resources

    3.2 Geology and Soils

    3.3 Cultural Resources

    3.4 Noise

    3.5 Hazards/Hazardous Materials

4.0 ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT

5.0 ALTERNATIVES TO THE PROPOSED PROJECT

6.0 LIST OF REFERENCES

7.0 LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED

8.0 LIST OF MITIGATION MEASURES AND ENVIRONMENTAL DESIGN CONSIDERATIONS    

TECHNICAL APPENDIXES

A: Initial Study

B: NOP and Comment Letters

C-1: Visual Impact Assessment

C-1: Figures

C-2: Community Design Guidelines for the Meadowood Specific Plan Area

D-1: Air Quality Report

D-1: Attachments

D-2: Global Climate Change Analysis

D-2: Attachments

E: Traffic Impact Study Information for the Reader

E: Traffic Impact Analysis

E: Meadowood I-15 Revised Cumulative Analysis

E: Appendix A and AA

E: Appendix B - G

E: Appendix H - L

E: Appendix M - U

E: Appendix V -Z

F-1: Biological Resources Assessment

F-1: Appendix A

F-1: Appendix B (1 of 2)

F-1: Appendix B (2 of 2)

F-1: Appendix C

F-1: Appendix D

F-1: Figure 3

F-1: Figure 4A

F-1: Figure 4B

F-1: Figure 4C

F-2: Jurisdictional Delineation Report

F-3: Resource Management Plan

F-3: Appendix A and B

F-3: Figures

F-4: Wetland Mitigation Plan

F-4: Figure 3

G-1: Geology Report

G-1: Appendix A

G-1: Appendix B

G-1: Appendix C

G-1: Appendix D

G-2: Geology Report Addendum 1

G-2: Geology Report Addendum 2

G-2: Rockfall Response

G-3: Response to Comments for Rockfall Potential

H: Cultural Resources Report

H: Appendix G

H: Appendix H

I: Noise Report

I: Attachments

J-1: Phase I and Limited Phase II Environmental Site Assessment

J-1: Appendix A - G

J-1: Appendix H

J-1: Appendix I

J-2: Fire Protection Plan

J-2: Appendix A - H

J-2: Figures

J-3: Project Facility Availability Form, Fire

K: San Diego County General Plan Compliance Report for the Meadowood Project

L-1: Stormwater Management Plan

L-1: Attachment A - D

L-1: Attachment E

L-1: Attachment F - I

L-2: Drainage Study

L-2: Appendix A

L-2: Appendix B - F

L-2: Appendix G

L-2: Appendix H - I

L-2: Appendix J

L-2: Appendix K - L

L-2: Map Pocket 1

L-2: Map Pocket 2

L-2: Map Pocket 3

L-2: Map Pocket 4

L-2: Map Pocket 5

L-2: Map Pocket 6

L-3: Hydromodification Management Study

L-3: Appendix A

L-3: Appendix B

L-3: Appendix C - E

L-3: Appendix F

L-3: HMP Review Letter

M: Mineral Resources

N-1: Water Study Report

N-1: Appendix A

N-1: Figures

N-2: Water Supply Assessment and Verification Report

N-2: Appendix A - C

N-3: Wastewater Service Alternative Analysis

N-3: Figures

N-4: County Facility Feasibility Study

O: Agricultural Report

O: Appendix A

O: Figures

GENERAL PLAN AMENDMENT REPORT

Appendix A: San Diego County General Plan Compliance Report

Appendix B: Residential Guidelines - Site Design and Architecture

Appendix A and B Figures

Graphics

B Designator Site Plan 1 of 2

B Designator Site Plan 2 of 2

Major Use Permit Wastewater Treatment Plant

Preliminary Grading Plans 1 of 2

Preliminary Grading Plans 2 of 2

Vesting Site Plan

Vesting Tentative Map

V Designator Site Plan