111007 Planning Commission Hearing

October 7, 2011

Agenda

Action Sheet

Audio #1 

Audio #2 

Audio #3 

Final Environmental Impact Report for Otay Crossings Commerce Park

TABLE OF CONTENTS

EXECUTIVE SUMMARY

SUMMARY TABLE

RESPONSE TO COMMENTERS

STATEMENT OF LOCATION AND CUSTODIAN OF DOCUMENTS OR OTHER MATERIALS THAT CONSTITUTE A RECORD OF PROCEEDINGS

CHAPTERS 

1.0 PROJECT DESCRIPTION, LOCATION, AND ENVIRONMENTAL SETTING

2.0 SIGNIFICANT ENVIRONMENTAL EFFECTS WHICH CANNOT BE AVOIDED IF THE PROPOSED PROJECT IS IMPLEMENTED

    2.1 Transportation/Circulation

    2.2 Air Quality/Global Climate Change

3.0 SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT WHICH CAN BE MITIGATED

    3.1 Biological Resources

    3.2 Cultural Resources

    3.3 Paleontological Resources

    3.4 Public Services and Utilities

    3.5 Noise

4.0 ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT

    4.1 Effects Found Not to be Significant as Part of the EIR Process

    4.2 Effects Found Not to be Significant During Review of Previously Approved Environmental Document

5.0 ALTERNATIVES TO THE PROPOSED PROJECT

6.0 LIST OF REFERENCES

7.0 LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED

8.0 LIST OF MITIGATION MEASURES AND ENVIRONMENTAL DESIGN CONSIDERATIONS

MAPS

Preliminary Grading Plans

Tentative Map

TECHNICAL APPENDIXES

A: Notice of Preparation (NOP) and Comments to the NOP

B: Traffic Impact Study

    Traffic Impact Study Appendix A - E

    Traffic Impact Study Appendix F - Q

C: Acoustical Assessment Report

D: Air Quality Technical Report

E: Global Climate Change Evaluation

F: Biological Resources Report

    On-Site Grassland and San Diego Barrel Cactus Mitigation Plan

    On-Site Revegetation Plan

    Off-Site Quino Checkerspot Butterfly and Burrowing Owl Habitat Enhancement Plan

    Off-Site Vernal Pool Revegetation Plan

    On-Site Biological Open Space Resource Management Plan

    Off-Site Biological Open Space at The Martz Conservation Parcel Resource Management Plan

    Off-Site Biological Open Space at Lonestar Ridge Resource Management Plan

G: Archaeological Resources Evaluation

H: Public Service/Utility Availability Forms

I: Conceptual Water Study/ Water Supply Assessment Report

J: Regional Sewer Study and Conceptual Sewer Study/Conceptual Sewer Pump Station Layout

K: Geotechnical Investigation

L: Storm Water Management Plan, Preliminary Hydrology/Drainage Study, and Hydromodification Management Plan

M: Fire Protection Plan