Lilac Hills Ranch
The Lilac Hills Ranch Project (GENERAL PLAN AMENDMENT (GPA) PDS2012-3800-12-001, ZONING RECLASSIFICATION PDS2012-3600-12-003 (REZ), SPECIFIC PLAN PDS2012-3810-12-001 (SP), MASTER TENTATIVE MAP PDS2012-3100-5571 (TM), IMPLEMENTING TENTATIVE MAP PDS2012-3100-5572 (TM), MAJOR USE PERMIT PDS2012-3300-12-005 (MUP), AND SITE PLAN PDS2012-3500-12-018 (STP)) was denied by the Board of Supervisors on June 24, 2020. For a statement of proceedings related to the Board of Supervisor action to deny the project please see the Board of Supervisor's Agenda and Minutes at the following links:
https://www.sandiegocounty.gov/content/sdc/cob/bosa.html
https://bosagenda.sandiegocounty.gov/cob/cosd/cob/doc?id=0901127e80bd951a
Presentations for June 24, 2020 Board of Supervisors Hearing:
June 12, 2020 Planning Commission Hearing Memo
At the May 15, 2020 Planning Commission (Commission) Hearing, the Commission requested Planning & Development Services (PDS) add an item to the June 12, 2020 agenda regarding the formation of an ad hoc subcommittee for the Lilac Hills Ranch project (Project) related to fire safety. This report provides background on the Project and summarizes the fire safety determination.
For instructions on how to participate in the June 12, 2020 Planning Commission Hearing, please CLICK HERE.
NOTICE REGARDING LILAC HILLS RANCH PLANNING COMMISSION JUNE 8,
2018 HEARING:
The Planning Commission hearing on
the Lilac Hills Ranch project this Friday, June 8 is to consider
whether the changes to the proposed project, which have occurred since
the Planning Commission’s recommendation on September 11, 2015, are
considered “substantial modifications” requiring additional review and
recommendation by the Planning Commission, as outlined by California
Government Code Section 65356. The hearing on this item is limited to
consideration of this issue. Public testimony will be limited to the
changes that have occurred to the proposed project since the Planning
Commission’s recommendation on September 11, 2015.
CLICK HERE for the Lilac Hills Ranch Recirculation Page. The Public Review Period is from February 22, 2018 to April 9, 2018.
Project Contact: Mark Slovick - Mark.Slovick@sdcounty.ca.gov , (858) 495-5172
To sign up for updates on this project, please click here: E-mail Updates
The Lilac Hills Ranch Project will not be heard by the Board of Supervisors on October 14, 2015. Updates regarding the Board of Supervisor’s hearing dates will be posted on this website and on the Clerk of the Board of Supervisors’ website in advance of the future hearing, which can be viewed at http://www.sandiegocounty.gov/content/sdc/cob/bosa.html.
Lilac Hills Ranch Planning Commission Hearing
Questions 9-11-15
PowerPoint Slides:
CEQA and Environmental Topics
Facilities, Services, Amenities
Fire Service and Evacuation
General Plan and Policy Conformance
Traffic & Roadways
Planning Commission Site Tour (08/12/2015) Video:
Attachment A
Attachment B
Attachment C (Part: 1 2 3)
Attachment D
Attachment E
Attachment F
Attachment G
Attachment H (Part: 1 2 3 4 5 6 7)
Attachment I
Attachment J
Attachment K
Attachment L
Attachment M
Attachment N
Attachment O
Attachment P
Draft Final Environmental Impact Report
Title Page & Table of Contents & List of Acronyms
Statement of Location and Custodian of Documents
Chaper 1 - Project Description, Location, and Environmental Setting (Part 1 2)
Chaper 2 - Significant Environmental Effects of the Proposed
Project
Visual Resources (Part 1 2)
Air Quality
Transportation/Traffic
Agricultural Resources (Part 1 2)
Biological
Resources (Part 1 2)
Cultural Resources
Hazards and Hazardous Materials
Noise
Significant Irreversible Environmental Changes
Chapter 3 - Environmental Effects Found Not to be
Significant
Geology and Soils
Greenhouse Gas Emissions
Hydrology and Water Quality
Land Use
Public Services
Recreation
Utilities and Service Systems
Energy Use and Conservation
Effects Found Not Significant During Initial Study
Chapter 4 - Project Alternatives (Part 1 2 3)
Chapter 5 - List of References
Chapter 6 - List of EIR Preparers and Persons and Organizations Contacted
Technical Appendices
Appendix A - Notice of Preparation (NOP) and
Initial Study
Appendix B - NOP Comments
Appendix C - Visual Resources Report (Part 1 2 3)
Appendix C-1 - Sight Distance Analyses
Appendix C-2 - Photometric Study (Part 1 2)
Appendix D - Air Quality Report
Appendix E - Traffic Impact Study (Part 1 2 3 4 5 6 7 8 9 10 11)
Traffic
Impact Appendices (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16)
Appendix F - Agricultural
Resources Report (Part 1 2 3 4)
Appendix G - Biological
Technical Report (Part 1 2 3 4 5 6)
Appendix H- Cultural
Resources Report & Addendum (Part 1 2 3 4 5 6 7 8 9)
Miller Fire Station Addendum
Gopher Canyon Road Addendum
Appendix I - Hazards and Hazardous Materials
I - Hazards On-Site (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23)
I - Hazards
Off-Site (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18)
I-1
Reconnaissance of Off-Site Improvement Areas (Part 1 2 3 4 5 6 7 8 9 10 11 12)
Appendix J - Fire Protection Plan
County of San Diego and CALFIRE Fire Protection
Agreement dated April 15, 2011
County of San Diego and CALFIRE Fire Protection
Agreement dated October 11, 2013
Appendix K - Evacuation Plan
Appendix L - Vector Management Plan
Appendix M - Noise Analysis
Appendix N - Geotechnical Study (Part 1 2 3 4 5)
Supplemental Geotechnical Study
Appendix O - Greenhouse Gas Analysis
Appendix P - Hydrogeologic Assessment
Appendix Q - Water Supply Assessment
Appendix R - Project Facility Availability
Forms
Appendix S - Wastewater Management
Alternatives
Appendix T - Water Service Report
Emergency Water Conservation Consistency
Analysis
Appendix U-1 - Stormwater
Management Plan
Master Tentative Map
(Part 1 2 3) Implementing Tentative Map
Appendix U-2 - Drainage Study
Master Tentative Map (Part 1 2 3 4) Implementing Tentative Map
Appendix U3 - Hydromodification Management Plan (Part 1 2 3 4)
Appendix V - Mountain
Ridge Road Fire Station Alternative
Air Quality Analysis
Traffic Impact Study (Part 1 2 3 4 5 6 7 8 9 10 11 12)
Traffic Impact Study
Appendices (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16)
Noise Analysis
Greenhouse Gas Analysis
Visual Analysis
Appendix W - General Plan Consistency Analysis Matrix
General Plan Amendment - Land Use
Element
General Plan Amendment - Mobility
Element
General Plan Amendment - Mobility Element Table
M-4
General Plan Amendment - Bonsall Community
Plan
General Plan Amendment - Valley Center Community Plan
Specific Plan - SP 12-001 (Part 1 2 3 4 5)
Specific Plan Strike Out
Underline (Part 1 2 3 4)
Appendices
1,000 - Scale Site Plan
Fire Station Public Road Alternative
Project Facility Availability Forms:
Schools (Valley Center Pauma Unified School District Bonsall Union School District School)
Water
Sewer
Fire
Police
Capabilities
Assessment (Part 1 2 3)
NGBS Certification
NGBS Application (Part 1 2 3 4 5 6 7 8 9)
Implementing Conceptual Landscape Plan - TM 5572 (Part 1 2 3)
Implementing Preliminary Grading Plan - TM 5572 (Part 1 2 3 4)
Implementing Tentative Map - TM 5572 (Part 1 2)
Major Use Permit - Wastewater Treatment Plant - MUP 12-005
Master Preliminary Grading Plan - TM 5571 (part 1 2 3)
Master Tentative Map - TM 5571 (Part 1 2)
Site Plan - D Designator and V Setbacks - STP 12-017 (Withdrawn)
Site Plan - Private Parks - STP 12-018
Roundabout Exhibit - Sight Distance (Exhibit 1) (Exhibit 2)
Roundabout Exhibit - Turning Movements
Roundabout Peer Review Exhibit of Findings
Modifications to Road Standards
West Lilac Road - I-15 Bridge to Old Highway
395
I-15 Bridge
West Lilac Road - Project Boundary to Westerly
Roundabout
West Lilac Road - Westerly Roundabout to Northerly
Project Boundary
West Lilac Road - Along Northerly Project
Boundary
West Lilac Road - Easterly Roundabout
Mountain Ridge Road - Reduced Design Speed
Mountain Ridge Road - Taper at Intersection with
Circle 'R' Drive
Street 'C' - Reduced Design Speed
Street 'E' - Reduced Design Speed
Reference Documents:
Lower Moosa Canyon Water Reclamation Facility
Expansion EIR
San Diego County Water Authority Urban Water
Management Plan