Lilac Hills Ranch Recirculation
NOTICE REGARDING LILAC HILLS RANCH PLANNING COMMISSION JUNE 8,
2018 HEARING:
The Planning Commission hearing on
the Lilac Hills Ranch project this Friday, June 8 is to consider
whether the changes to the proposed project, which have occurred since
the Planning Commission’s recommendation on September 11, 2015, are
considered “substantial modifications” requiring additional review and
recommendation by the Planning Commission, as outlined by California
Government Code Section 65356. The hearing on this item is limited to
consideration of this issue. Public testimony will be limited to the
changes that have occurred to the proposed project since the Planning
Commission’s recommendation on September 11, 2015.
PDS2012-3800-12-001, PDS2012-3810-12-001, PDS2012-3600-12-003, PDS2012-3100-5571, PDS2012-3100-5572, PDS2012-3300-12-005, PDS2012-3500-5572, PDS2012-3300-12-005, PDS2012-3500-12-018, HLP-XX-XXXX, PDS2012-3910-12-02-003
The Project includes a General Plan Amendment (PDS2012-3800-12-001), a Specific Plan (PDS2012-3810-12-001) a Zone Reclassification (PDS2012-3600-12-003), two Tentative Maps (PDS2012-3100-5571 & PDS2012-3100-5572), a Major Use Permit (PDS2012-3300-12-005), a Site Plan (PDS2012-3500-12-018), and a Draft Habitat Loss Permit (PDSXXXX-HLP-XXX).
The project is located on approximately 608-acres of property and
consists of a mix of residential, commercial, and institutional uses,
along with parks and open space. Specifically, the project would
include: 90,000 square feet of commercial, office, and retail,
including a 50-room country inn; 903 traditional single-family
detached homes; 164 single-family attached homes; 211 residential
units within a senior citizens neighborhood; necessary facilities and
amenities to serve the senior population (including a senior community
center, a group care facility, and a memory care facility); and a
2.0-acre Community Purpose Facilities (CPF) area that could be
comprised of a private recreational facility and civic fire station,
with the total area of both not to exceed 40,000 square feet. The
project also proposes a school site to accommodate K-8 students,
public and private parks, and other recreational amenities. Also
planned within the project site are a Recycling Facility (RF), a Water
Reclamation Facility (WRF), and other supporting
infrastructure.
Project Manager: Mark Slovick | Mark.Slovick@sdcounty.ca.gov | (858) 495-5172
PUBLIC REVIEW PERIOD (FEBRUARY 22, 2018 - APRIL 9, 2018)
RECIRCULATION DRAFT ENVIRONMENTAL IMPACT REPORT
CHAPTER 2.3 TRANSPORTATION/TRAFFIC
CHAPTER 2.9 GREENHOUSE GAS EMISSIONS
TECHNICAL ADDENDUM TO 2015 TRAFFIC IMPACT STUDY
GLOBAL CLIMATE CHANGE ANALYSIS (MEMO)
LILAC HILLS RANCH AIR QUALITY TECHNICAL MEMO
SPECIFIC PLAN CLEAN (PART: 1,
2,
3,
4,
5,
6,
7)
SPECIFIC
PLAN STRIKE OUT UNDERLINE
APPENDIX
A. 1,000 SCALE VICINITY MAP
APPENDIX
B. FIRE STATION PUBLIC ROAD ALTERNATIVE
APPENDIX C.
PROJECT AVAILABILITY FORMS (SCHOOL,
WATER,
SEWER,
FIRE,
LAW
ENFORCEMENT)
APPENDIX D. CAPABILITIES ASSESSMENT (PART:
1,
2)
APPENDIX
E. BONSALL COMMUNITY PLAN STRIKEOUT UNDERLINE
APPENDIX
F. VALLEY CENTER COMMUNITY PLAN STRIKEOUT UNDERLINE
APPENDIX
G. NGBS LETTER OF APPROVAL FOR FUTURE CERTIFICATION
APPENDIX H. NGBS APPLICATION (PART: 1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11)
MASTER TENTATIVE MAP - TM-5571 (PART: 1, 2)
IMPLEMENTING TENTATIVE MAP - TM-5572 (PART: 1, 2)
MASTER PRELIMINARY GRADING PLAN - TM-5571 (PART: 1, 2, 3)
IMPLEMENTING PRELIMINARY GRADING PLAN - TM-5572 (PART: 1, 2, 3, 4)
MODIFICATIONS TO ROAD STANDARDS
1.
WEST LILAC ROAD - I-15 BRIDGE TO OLD HIGHWAY 395
2.
I-15 BRIDGE
3. WEST LILAC ROAD - PROJECT BOUNDARY TO
WESTERLY ROUNDABOUT (OPTION
A, OPTION
B)
4.
WEST LILAC ROAD - WESTERLY ROUNDABOUT TO NORTHERLY PROJECT
BOUNDARY
6. WEST
LILAC ROAD - EASTERLY ROUNDABOUT
9. STREET
'C' - REDUCED DESIGN SPEED
10. STREET
'E' - REDUCED DESIGN SPEED
WITHDRAWAL
LETTER FOR MODIFICATIONS:
5. WEST LILAC ROAD -
ALONG NORTHERLY PROJECT BOUNDARY
7. MOUNTAIN RIDGE ROAD
- REDUCED DESIGN SPEED
8. MOUNTAIN RIDGE ROAD - TAPER AT
INTERSECTION WITH CIRCLE 'R' DRIVE
ADDITIONAL LINKS
Click Here for environmental documentation distributed during the original public review period (July 3, 2013 - August 19, 2013).
Click Here for environmental documentation distributed during the recirculation public review period (June 12, 2014 - July 28, 2014).
Click Here for the Current Projects page of the project.