Bradley Court Convalescence

PDS2021-MUP-85-053W2; PDS2021-ER-21-14-004

The proposed project involves expanding the existing Bradley Court Convalescent Center to construct a new 25,515 square-foot assisted living building with 66 resident beds, and a new 10,613 square foot 31-bed skilled nursing building, for a total of 97 new beds. Upon completion of the expansion, the project site would include four buildings with 87 skilled nursing beds and 66 transitional care beds, for a total of 153 beds. The existing residential building would be converted to a controlled access building. The site currently takes access from Bradley Avenue, a County maintained road. This driveway is proposed to be relocated eastward to be more centered to the project site. The proposed project would include a new fire lane access road allowing access to the rear of existing Building 2 and the new Building 3. The existing parking area would be redesigned to accommodate the proposed buildings and provide 73 parking spaces, including 3 electric vehicle (EV) charging spaces. The project is located at 675 East Bradley Avenue, El Cajon, CA 92021 in the Lakeside Community Planning Area. Access would continue to be provided off East Bradley Avenue.  The project would be served by Padre Dam Municipal Water District for sewer with imported water from Helix Water District. Fire service would be provided by the San Miguel Fire Protection District.  

Comments on the proposed findings and associated analysis must be received no later than January 13, 2025, at 4:00 p.m. (a 33-day public review period).

Please direct any questions or formal comments to the project contact below.

Project Contact: Daniella Hofreiter | Daniellat.Hofreiter@sdcounty.ca.gov | (619) 619-4431

...

PUBLIC REVIEW PERIOD (December 12, 2024 to January 13, 2025)

ENVIRONMENTAL DOCUMENTS

TECHNICAL STUDIES

PROJECT DOCUMENTS