Permit Type | FY 2023-24 Code Section |
FY 2024-25 Code Section | FY
2023-24 Fee | FY 2024-25 Approved Fee |
Recycled Water Plan Check Fees: Hourly rate as authorized in
subsection (m). | 65.107(g)(1) | 65.107(g)(1) |
Varies, see hourly rates in miscellaneous department
fees | Varies, see hourly rates in miscellaneous
department fees |
Recycled Water Inspection: Hourly rate as authorized in
subsection (m). | 65.107(g)(2) | 65.107(g)(2) |
Varies, see hourly rates in miscellaneous department
fees | Varies, see hourly rates in miscellaneous
department fees |
Percolation Test/Soil Profile Review | |
65.107(g)(3) | | $ 940 |
Layout Report: New Construction | 65.107(g)(5) |
65.107(g)(3) | $ 1,355 | $ 1,693 |
Layout Report: Additions/Pools | 65.107(g)(5) |
65.107(g)(3) | $ 1,217 | $ 1,495 |
Layout Report: Revision | 65.107(g)(5) |
65.107(g)(3) | $ 753 | $ 964 |
Layout Diagram/Information Review over the counter, no field
investigation | 65.107(g)(5) | 65.107(g)(3) |
$ 159 | $ 266 |
Septic Tank / Seepage Pit Destruction Stand Alone Project:
Hourly rate as authorized in subsection (m). | |
65.107(g)(4) | | Varies, see hourly rates
in miscellaneous department fees |
Septic Tank / Seepage Pit Destruction with Repair Project:
Hourly rate as authorized in subsection (m). | |
65.107(g)(4) | | Varies, see hourly rates
in miscellaneous department fees |
Holding Tank / Vaulted-Privy / Other Sanitation Facilities
Project Review: Hourly rate as authorized in subsection
(m). | | 65.107(g)(4) | |
Varies, see hourly rates in miscellaneous department
fees |
Holding Tank / Vaulted-Privy / Other Sanitation Facilities
Installation Permit: Hourly rate as authorized in subsection
(m). | | 65.107(g)(4) | |
Varies, see hourly rates in miscellaneous department
fees |
Standard Onsite Wastewater System Installation Permit |
65.107(g)(6) | 65.107(g)(4) | $ 606 | $
881 |
Standard Onsite Wastewater System Re-Inspection |
65.107(g)(6) | 65.107(g)(4) | $ 287 | $
370 |
Standard Onsite Wastewater System Repair Installation
Permit | 65.107(g)(6) | 65.107(g)(4) | $
578 | $ 852 |
Treated Onsite Wastewater System Installation Permit |
65.107(g)(6) | 65.107(g)(4) | $ 1,210 | $
1,563 |
Treated Onsite Wastewater System Major Repair Installation
Permit | 65.107(g)(6) | 65.107(g)(4) | $
1,242 | $ 1,535 |
Treated Onsite Wastewater System Annual Operating Permit |
65.107(g)(6) | 65.107(g)(4) | $ 410 | $
578 |
Onsite Wastewater System Enforcement: Assessed at the approved
hourly rate as authorized in subsection (m), minimum two
hours | 65.107(g)(6) | 65.107(g)(4) |
Varies, see hourly rates in miscellaneous department
fees | Varies, see hourly rates in miscellaneous
department fees |
Qualified Professional, Licensed Installer, Qualified Service
Provider, Owner-Builder Demonstration (Consultation Review)
Assessed at the approved hourly rate as authorized in subsection
(m), minimum two hours | | 65.107(g)(4) |
| Varies, see hourly rates in miscellaneous
department fees |
Qualified Professional, Licensed Installer, Qualified Service
Provider, Owner-Builder Annual Registration | |
65.107(g)(4) | | $ 66 |
Lot Line Adjustment/Certificate of Compliance/Conditional
Certificate of Compliance, up to four lots, field investigation
needed | 65.107(g)(7) | 65.107(g)(5) | $
1,204 | $ 1,768 |
Lot Line Adjustment/Certificate of Compliance/Conditional
Certificate of Compliance over the counter, no field
investigation | 65.107(g)(8) | 65.107(g)(6) |
$ 288 | $ 421 |
Graywater System Permits: Plan Review - with field check |
65.107(g)(9) | 65.107(g)(7) | $ 569 | $
862 |
Graywater System Permits: Installation Inspections |
65.107(g)(9) | 65.107(g)(7) | $ 485 | $
745 |
Graywater System Permits: Re-Inspection Fee |
65.107(g)(9) | 65.107(g)(7) | $ 247 | $
325 |
Complaint response. Department costs to investigate a
complaint and to verify return to compliance not otherwise
recovered through a reinspection fee, only if the complaint is
substantially validated: Assessed at the approved hourly rate as
authorized in subsection (m). | 65.107(g)(10) |
65.107(g)(8) | Varies, see hourly rates in
miscellaneous department fees | Varies, see
hourly rates in miscellaneous department fees |
Sewage Pumper Examination Fee | 65.107(g)(11) |
65.107(g)(9) | $ 107 | $ 198 |
Sewage Pumper Base Registration Fee |
65.107(g)(12) | 65.107(g)(10) | $ 207 | $
309 |
Sewage Pumping Vehicle Permit (per vehicle) |
65.107(g)(13) | 65.107(g)(11) | $ 153 | $
189 |
Sewage Pumping Vehicle complaint response. Department costs to
investigate a complaint of non- compliance by a sewage pumping
vehicle, and Department costs to verify return to compliance not
otherwise recovered through a reinspection fee, only if the
complaint is substantially validated: Assessed at the approved
hourly rate as authorized in subsection (m). |
65.107(g)(14) | 65.107(g)(12) | Varies, see
hourly rates in miscellaneous department fees |
Varies, see hourly rates in miscellaneous department
fees |
Grading Plan, Major | 65.107(g)(15) |
65.107(g)(13) | $ 482 | $ 811 |
Deposit for a Special Projects Application Review (Initial
deposit, additional funds at the hourly rate may be required for
full cost recovery) | 65.107(g)(16) |
65.107(g)(14) | $ 1,235 | $ 1,552 |
Deposit for a Tentative Map (Initial deposit, additional funds
at the hourly rate may be required for full cost recovery) |
65.107(g)(17) | 65.107(g)(15) | $ 3,195 |
$ 3,492 |
Deposit for Tentative Parcel Map on Septic or Sewer (Initial
deposit, additional funds at the hourly rate may be required for
full cost recovery) | 65.107(g)(18) |
65.107(g)(16) | $ 1,698 | $ 1,940 |
Deposit for Major Use Permits, Standard Application Review
(Initial deposit, additional funds may be required at the hourly
rate for full cost recovery) | 65.107(g)(19) |
65.107(g)(17) | $ 1,445 | $ 1,940 |
Major Use Permit Modification/Minor Deviation |
65.107(g)(20) | 65.107(g)(18) | $ 845 | $
1,115 |
Discretionary Project Review | 65.107(g)(21) |
65.107(g)(19) | $ 706 | $ 1,153 |
Administrative Permit Standard Application |
65.107(g)(22) | 65.107(g)(20) | $ 899 | $
1,250 |
Major Project Pre-application Conference |
65.107(g)(23) | 65.107(g)(21) | $ 905 | $
1,445 |
Pre-application Conference (Initial Consultation - No
Permit) | 65.107(g)(24) | 65.107(g)(22) | $
308 | $ 443 |
Site Plan Application | 65.107(g)(25) |
65.107(g)(23) | $ 661 | $ 1,032 |