Permit Type | FY 2023-24 Code Section |
FY 2024-25 Code Section | FY
2023-24 Fee | FY 2024-25 Approved Fee |
Well Permit Application: Domestic Well |
65.107(g)(3) | 65.107(h)(1)(a) | $ 1,042 |
$ 1,334 |
Well Permit Application: Public Water Supply Well |
65.107(g)(3) | 65.107(h)(1)(b) | $ 2,014 |
$ 2,397 |
Well Permit Application: Well Destruction |
65.107(g)(3) | 65.107(h)(1)(c) | $ 1,019 |
$ 1,228 |
Monitoring Wells/Soil Boring: Initial | |
65.107(h)(1)(d)(i) | $ 372 | $ 421 |
Monitoring Wells/Soil Boring: Each Additional Soil Boring at a
single site | 65.107(h)(1) |
65.107(h)(1)(d)(i) | $ 113 | $ 129 |
Monitoring Wells (Ground Water/Vadose Wells/Cathodic
Protection Wells): Initial Monitoring Well |
65.107(h)(2) | 65.107(h)(1)(d)(ii) | $ 670 |
$ 768 |
Monitoring Wells (Ground Water/Vadose Wells/Cathodic
Protection Wells): Each Additional Monitoring Well at a single
site | 65.107(h)(2) | 65.107(h)(1)(d)(ii) | $
420 | $ 490 |
Monitoring Well Destruction: Initial Monitoring Well
Destruction | 65.107(h)(3) |
65.107(h)(1)(d)(iii) | $ 314 | $ 377 |
Monitoring Well Destruction: Each Additional Monitoring Well
Destruction at a single site | 65.107(h)(3) |
65.107(h)(1)(d)(iii) | $ 201 | $ 234 |
Soil Vapor Survey (per site) | 65.107(h)(6) |
65.107(h)(1)(e) | $ 1,230 | $ 1,411 |
Extension of Permit | 65.107(h)(5) |
65.107(h)(2) | $ 81 | $ 108 |
Inactive Well Declaration | 65.107(g)(3) |
65.107(h)(3) | $ 705 | $ 806 |
Plan Check Re-submittal Fee. Assessed at the approved hourly
rate as authorized in subsection (m). | |
65.107(h)(4) | | Varies, see hourly rates
in miscellaneous department fees |
Water Well Inspection Fee: For plan check inspections and
final well permit re-inspections. Assessed at the approved
hourly rate as authorized in subsection (m). | |
65.107(h)(5) | | Varies, see hourly rates
in miscellaneous department fees |
Monitoring Well Re-inspection Fee (per site) |
65.107(h)(4) | 65.107(h)(6) | $ 575 | $
668 |
Review of variance from State Well Standards. Assessed at the
approved hourly rate as authorized in subsection (m). |
| 65.107(h)(7) | | Varies, see
hourly rates in miscellaneous department fees |
Discretionary/CEQA Review. Minimum charge, 2 hours at the
approved hourly rate as authorized in subsection (m). |
| 65.107(h)(8) | | Varies, see
hourly rates in miscellaneous department fees |
Collected Water Sample from Private Well |
65.107(g)(4) | 65.107(h)(9) | $ 648 | $
786 |
Investigative Fee. For work done without a permit for which a
permit is required or work done that is not in compliance with
an approved permit: 100% of the permit cost. |
65.107(h)(7) | 65.107(h)(10) | 100% of permit
cost | 100% of permit cost |
Miscellaneous Well Program Fee. Includes Monitoring Well
Program activities where no fee is specifically indicated.
Assessed at the approved hourly rate as authorized in subsection
(m). | 65.107(h)(8) | 65.107(h)(11) |
Varies, see hourly rates in miscellaneous department
fees | Varies, see hourly rates in miscellaneous
department fees |
Complaint Response. Department costs to investigate a
complaint and to verify return to compliance not otherwise
recovered through a reinspection fee, only if the complaint is
substantially validated. Assessed at the approved hourly rate as
authorized in subsection (m). | |
65.107(h)(12) | | Varies, see hourly rates
in miscellaneous department fees |
Enforcement Fee for noncompliance with permitting requirements
and conditions as provided for in Section 67.440. Assessed at
the approved hourly rate as authorized in subsection (m). |
| 65.107(h)(13) | | Varies, see
hourly rates in miscellaneous department fees |