Plan Check Fees

Permit Type Current Code Section FY 2025-26 Code Section Current Fees FY 2025-26 Proposed Fees
Pool Plan Review: One (1) body of water 65.107(e)(1)(a) 65.107(e)(1)(a) $ 2,029 $ 2,092
Pool Plan Review: Each body of water in excess of one (1) 65.107(e)(1)(b) 65.107(e)(1)(b) $ 846 $ 941
Pool Plan Review: Supplemental Fee for special purpose pools and perimeter overflow system pools (includes activities pools, spray grounds, pools > 3,000 square feet, and interactive water features) 65.107(e)(1)(c) 65.107(e)(1)(c) $ 1,619 $ 1,692
Pool Plan Review: Minor Remodel of one (1) Body of water 65.107(e)(1)(d) 65.107(e)(1)(d) $ 469 $ 490
Pool Plan Review: Additional fee for a Minor Remodel if each body of water over one (1), (If with concurrent inspections for all bodies of water) 65.107(e)(1)(e) 65.107(e)(1)(e) $ 189 $ 212
Pool Plan Review: Renovation for each one (1) body of water 65.107(e)(1)(f) 65.107(e)(1)(f) $ 772 $ 802
Pool Plan Review: Major Remodel for each one (1) body of water 65.107(e)(1)(g) 65.107(e)(1)(g) $ 1,402 $ 1,457
Pool Facility Major Remodel Plan Revision, and Body of Water as Built Plan 65.107(e)(1)(h) 65.107(e)(1)(h) $ 473 $ 495
Restamping, Body of Water Minor Remodel Plan Revision, Body of Water Renovation Plan Revision, or Approval of Non-Health Regulated Building Plans as required by other governmental agencies 65.107(e)(1)(i) 65.107(e)(1)(i) $ 210 $ 232
Pool Plan Review: Additional fee for each construction inspection of a body of water that is not conducted concurrently with another Body of Water on the same project: Assessed at the approved hourly rate as authorized in subsection (m). 65.107(e)(1)(j) 65.107(e)(1)(j) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Pool Plan Review: Plan check review and related consultations, when construction was initiated prior to the approval of plans by both the Department and the local agency with authority over building plans:  Assessed at the approved hourly rate as authorized in subsection (m). 65.107(e)(1)(k) 65.107(e)(1)(k) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Food Facility Plan Review: 0 - 1,999 Square Feet (up to three preparation areas) 65.107(e)(2)(a) 65.107(e)(2)(a) $ 1,504 $ 1,534
Food Facility Plan Review: 2,000 - 5,999 Square Feet (up to three preparation areas) 65.107(e)(2)(b) 65.107(e)(2)(b) $ 1,893 $ 1,931
Food Facility Plan Review: 6,000 - 9,999 Square Feet (up to three preparation areas) 65.107(e)(2)(c) 65.107(e)(2)(c) $ 3,091 $ 3,153
Food Facility Plan Review: 10,000 Square Feet and over (one preparation area) 65.107(e)(2)(d) 65.107(e)(2)(d) $ 3,340 $ 3,407
Food Facility Plan Review: Each additional food preparation area after three sites for 0 - 9,999 square feet, and after one for 10,000 square feet or greater 65.107(e)(2)(e) 65.107(e)(2)(e) $ 666 $ 679
Prepackaged Food or Wholesale Food Warehouse Plan Review: 0 – 7,999 square feet 65.107(e)(3)(a)  65.107(e)(3)(a)  $ 794 $ 810
Prepackaged Food or Wholesale Food Warehouse Plan Review: 8,000 square feet and over 65.107(e)(3)(b) 65.107(e)(3)(b) $ 983 $ 1,003
Multiple Kitchen Complex Plan Review 65.107(e)(4) 65.107(e)(4) $ 1,418 $ 1,446
Full Service/Direct Sales Catering Plan Review 65.107(e)(5) 65.107(e)(5) $ 516 $ 526
Food Facility Minor Remodel Plan Review 65.107(e)(6) 65.107(e)(6) $ 657 $ 670
Prepackaged CMFO/Prepackaged Truck Mobile Food Facility Plan Review 65.107(e)(7) 65.107(e)(7) $ 287 $ 293
Unpackaged CMFO Plan Review 65.107(e)(8) 65.107(e)(8) $ 508 $ 518
Open Food Preparation Truck Mobile Food Facility Plan Review 65.107(e)(9) 65.107(e)(9) $ 534 $ 545
Mobile Food Support Unit Plan Review 65.107(e)(10) 65.107(e)(10) $ 567 $ 578
Prepackaged CMFO/Prepackaged Truck Mobile Food Facility Template Plan Review 65.107(e)(11) 65.107(e)(11) $ 251 $ 256
Unpackaged CMFO Template Plan Review 65.107(e)(12) 65.107(e)(12) $ 296 $ 302
Food Facility Plan Revision 65.107(e)(13) 65.107(e)(13) $ 400 $ 408
Miscellaneous Facilities Plan Review: Body Art Facility Plan Review (Body Art Facility) 65.107(e)(14)(a) 65.107(e)(14)(a) $ 635 $ 648
Miscellaneous Facilities Plan Review: Massage Establishment Plan Review (Massage Establishment) 65.107(e)(14)(b) 65.107(e)(14)(b) $ 616 $ 628
Miscellaneous Facilities Plan Review: Bathhouses or other miscellaneous establishments where a plan review is required 65.107(e)(14)(c) 65.107(e)(14)(c) $ 463 $ 472
Expedited Plan Review: Two times the plan check fee 65.107(e)(15) 65.107(e)(15) 2x Plan Check Fee 2x Plan Check Fee
Expedited Plan Check Inspection: Assessed at one and a half times the approved hourly rate as authorized in subsection (m), minimum two hours. 65.107(e)(16) 65.107(e)(16) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Food Plan Check Office Consultation 65.107(e)(17) 65.107(e)(17) $ 182 $ 186
Food Plan Check Field Consultation 65.107(e)(18) 65.107(e)(18) $ 393 $ 401
Pool Plan Check Office Consultation 65.107(e)(19) 65.107(e)(19) $ 204 $ 229
Pool Plan Check Field Consultation 65.107(e)(20) 65.107(e)(20) $ 407 $ 440
Body Art Plan Check Office Consultation 65.107(e)(21) 65.107(e)(21) $ 202 $ 206
Body Art Plan Check Field Consultation 65.107(e)(22) 65.107(e)(22) $ 405 $ 413
Massage Plan Check Office Consultation 65.107(e)(23) 65.107(e)(23) $ 205 $ 209
Massage Plan Check Field Consultation 65.107(e)(24) 65.107(e)(24) $ 409 $ 417
Investigation of work without a permit. Whenever a food facility is built, modified or remodeled without first submitting an application for the required permit/plan review, a special investigation shall be made before a permit may be issued for such work. The fee for this investigation will be in addition to the permit fee. 65.107(e)(25) 65.107(e)(25) $ 339 $ 346
Investigation of work without a permit. Whenever a pool is built, modified or remodeled without first submitting an application for the required permit/plan review, a special investigation shall be made before a permit may be issued for such work. The fee for this investigation will be in addition to the permit fee. 65.107(e)(26) 65.107(e)(26) $ 375 $ 385