Radiation Shielding Plan Check Fees
Permit Type | FY 2023-24 Code Section |
FY 2024-25 Code Section | FY
2023-24 Fee | FY 2024-25 Approved Fee |
Radiation Shielding Plan Check Fee (base fee includes two
rooms) | 65.107(l)(1) | 65.107(l)(1) | $
100 | $ 102 |
For more complex plan checks: Sites are billed at the approved
hourly rate as authorized in subsection (m)(7) for additional
plan check and inspection costs that exceed the hours covered
by the fee calculated above. | 65.107(l)(2) |
65.107(l)(2) | $ 184/hour | $ 194/hour |