Valiano
PDS2013-SP-13-001, PDS2013-GPA-13-001, PDS2013-REZ-13-001,
PDS2013-TM-5575,
PDS2014-MUP-14-019, PDS2013-STP-13-003, PDS2013-ER-13-08-002
The Project includes a Specific Plan (PDS2013-SP-13-001), a General Plan Amendment (PDS2013-GPA-13-001), a Zone Reclassification (PDS2013-REZ-13-001), a Tentative Map (PDS2013-TM-5575), a Major Use Permit (PDS2014-MUP-14-019), a Site Plan (PDS2014-STP-14-019), and a draft Habitat Loss Permit (PDSXXX-HLP-XXXX).
The proposed project includes 326 dwelling units in five neighborhoods, each with varying densities, lot sizes, and architectural styles. A multi-use trail traversing the development to provide recreational opportunities for a variety of users, including equestrian, is proposed. Thirty percent of the project site will be conserved as open space. This includes 31 acres of biological open space and 35 acres for an agricultural easement. In addition, 56 acres of common area open space and 27 acres of landscaped easements will provide for a total open space of 149 acres. The project also provides one public park, two private parks, a public equestrian staging area, and a private trail turnaround area, 2.6 miles of trails and an on-site wastewater treatment facility.
Project Contact: Michelle Chan | Michelle.Chan@sdcounty.ca.gov | (858) 495-5428
Environmental Coordinator: Donna Beddow | Donna.Beddow@sdcounty.ca.gov | (858) 694-3656
FINAL ENVIRONMENTAL IMPACT REPORT
(Click here for Draft EIR documents)
CHAPTER 1.0 - PROJECT DESCRIPTION, LOCATION, AND SETTING
CHAPTER 2.0 - SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT
2.1 AESTHETICS
2.2
AIR QUALITY
2.3
AGRICULTURAL RESOURCES
2.4
BIOLOGICAL RESOURCES
2.5
CULTURAL RESOURCES
2.6
NOISE
2.7
PALEONTOLOGICAL RESOURCES
2.8
TRANSPORTATION/TRAFFIC
2.9
HAZARDS AND HAZARDOUS MATERIALS
2.10
GEOLOGY AND SOILS
2.11
SIGNIFICANT AND IRREVERSIBLE ENVIRONMENTAL CHANGES
CHAPTER 3.0 ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT
3.1.1
GREENHOUSE GAS
3.1.2
ENERGY
3.1.3
HYDROLOGY AND WATER QUALITY
3.1.4
LAND USE AND PLANNING
3.1.5
POPULATION AND HOUSING
3.1.6
RECREATION
3.1.7
PUBLIC SERVICES
3.1.8
UTILITIES AND SERVICE SYSTEMS
3.2
EFFECTS FOUND NOT TO BE SIGNIFICANT DURING INITIAL STUDY
CHAPTER 4.0 - PROJECT ALTERNATIVES
CHAPTER 5.0 - LIST OF REFERENCES
CHAPTER 6.0 - LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED
CHAPTER 7.0 - LIST OF MITIGATION MEASURES AND PROJECT DESIGN FEATURES
RESPONSE TO COMMENTS:
Draft Environmental Impact Report Response to Comments (Compiled)
Recirculated Draft Environmental Impact Report Response to Comments (Compiled)
Comments Received on the Draft EIR
Federal Agencies (No Letters Received)
State Agencies
County, City, and Other Local Agencies
San
Diego Local Agency Formation Commission (LAFCO)
Rincon
del Diablo Water District
San
Diego Association of Governments (SANDAG)
City
of Escondido
City
of San Marcos
Elfin
Forest Harmony Grove Town Council
Organizations
Friends
of Eden Valley for Responsible Development
Elfin
Forest Harmony Grove Town Council and Friends of Eden Valley for
Responsible Development
J.
Whalen and Associates, Inc. on behalf of Friends of Eden Valley and
the Elfin Forest Harmony Grove Town Council
Johnson
& Sedlack on behalf of the Elfin Forest Harmony Grove Town
Council
Tierra
Data on behalf of Elfin Forest Harmony Grove Town Council
San
Dieguito Planning Group
Endangered
Habitats League
The
Escondido Creek Conservancy
Natural
Resources Defense Council
Kevin
K. Johnson, APLC, on behalf of the San Elijo Lagoon
Conservancy
Pechanga
Band of Luiseno Mission Indians
San
Diego Archaeolgoical Society
San
Luis Rey Band of Mission Indians
Individual Commenters on the Draft EIR
Comments Received on the Recirculated Draft EIR
State Agencies & Federal Agencies (No letters Received)
County, City, and Other Local Agencies
Organizations
San
Luis Rey Band of Mission Indians
Endangered
Habitats League
The
Escondido Creek Conservancy
San
Dieguito Planning Group
Johnson,
Smith & Foy on behalf of the Elfin Forest Harmony Grove Town
Council
Crest/Dehesa/Granite
Hills/Harbison Canyon Subregional Planning Group
Bonsall
Community Sponsor Group
Del
Dios/Mt. Israel Town Council
Friends
of Eden Valley for Responsible Development
Individual Commenters on the Recirculated Draft EIR
Late Letters on the Recirculated Draft EIR
Campo
Lake Morena Planning Group
San
Diego County Sanitation District
Leslie
Caskey
Mary
Cross
Patricia
Borchmann
Valley
Center Community Planning Group
Late Comments
Compiled
Responses to Planning Commission Comment Letters
Law
Offices of Abigail Smith (On Behalf of Elfin Forest Harmony Grove
Town Council) dated May 10, 2018
Endangered Habitats
League Part
1 and Part
2 dated May 7, 2018
Elfin
Forest Harmony Grove Town Council Evacuation Plan Letter dated May
9, 2018
Elfin
Forest Harmony Grove Town Council Valiano Vineyards dated May 9,
2018
The
Valiano Vineyards Alternative
Debra
Toner email dated May 10, 2018
Johanna
Maurice email dated May 10, 2018
Karen
Binns email dated May 9, 2018
Camille
Zeleny, Mike Wittmer, Mr. and Mrs. Brown, Janine Young
Tina
Pope, David Bennett, San Marcos Chamber of Commerce, Byram Frost,
Mike Lukic, Bredan Theissen, Gordan Fines, Steven and Jacqui White,
Kirk Effinger
TECHNICAL APPENDICES
A | Notice of Preparation |
B | Visual Impact Analysis (Parts: 1, 2, 3, 4, 5, 6) |
C | Air Quality Analysis Report |
D | Agricultural Resources Report |
E | Biological Technical Report |
F | Cultural Resources Inventory (Parts: 1, 2) |
G | Acoustical Site Assessment Report |
H | Traffic Impact Analysis, Appendices |
I | Phase I and II
Environmental Site Assessment (ESA): (Northern,
Central,
Neighborhood
5) |
J | Greenhouse Gases Analyses Study |
K | Geotechnical Investigations: Neighborhoods 1-4, Neighborhood 5 |
L | Fire Protection Plan |
M | CEQA Drainage Study (Parts: 1, 2, 3) |
Hydromodification Management Study | |
N | Stormwater Management Plan |
O | Project Facility Availability Forms |
P | Conceptual Water and Recycled Water Study |
Q | Conceptual Sewer Study |
PROJECT DOCUMENTS
Resource Protection Ordinance Slope Analysis
Wastewater Treatment and Wastewater Reclamation Plan Preliminary Design Report
RECIRCULATION DRAFT ENVIRONMENTAL IMPACT REPORT
RECIRCULATION READERS GUIDE
LEGAL AD
NOTICE OF AVAILABILITY
TITLE PAGE
CHAPTER 1 PROJECT
DESCRIPTION, LOCATION, AND ENVIRONMENTAL SETTING (Parts: 1 2 3 )
CHAPTER 3.1.1 GLOBAL GREENHOUSE GASES
CHAPTER 3.1.4 LAND USE AND PLANNING
CHAPTER 7 LIST OF MITIGATION MEASURES AND PROJECT
DESIGN FEATURES
REVISED GREENHOUSE GAS REPORT
EXHIBITS: 1 2
PROJECT DOCUMENTS
LEGAL AD - NOTICE OF AVAILABILITY
SPECIFIC PLAN
Cover & Table of Contents
Chapter 1 Introduction
Chapter 2
Land Use Design (Parts: 1, 2 )
Chapter 3 Circulation Plan
Chapter 4 Resources On-site
Chapter 5 Public Services Facilities
Chapter 6 Utilities
Chapter 7 Public Facilities Financing
Phasing
Chapter 8 Implementation
Tentative Map
Preliminary Grading Plan
Conceptual Landscape Plan
Site Plan
Vicinity Map
Aerial Photograph
ENVIRONMENTAL DOCUMENTS
Public Comments
State agency comments:
Caltrans
Caltrans follow-up
Local agency comments:
City of Escondido
City of San Marcos
LAFCO
SANDAG
Individual comments:
A through D
E through K
L through O
P through Z
Non-profits and Tribes:
EFHGTC & FEVFRD main letter
EFHGTC Septic Clarification
EFHGTC & FEVFRD J. Whalen Associates
letter
EFHGTC & FEVFRD Johnson&Sedlack
letter
EFHGTC & FEVFRD Tierradata letter
Endangered Habitats League
The Escondido Creek Conservancy
Friends of Eden Valley for Responsible
Development
Natural Resources Defense Council
Pechanga Band of Luiseno Indians
Rincon del Diablo MWD
San Diego County Archaeology Society,
Inc.
San Dieguito Community Planning Group
San Elijo Lagoon Conservancy
San Luis Rey Band of Mission Indians
TOC, LIST OF ACRONYMS AND ABBREVIATIONS
SUMMARY
CHAPTER 1.0 PROJECT DESCRIPTION,
LOCATION, AND ENVIRONMENTAL SETTING
(Parts: 1, 2, 3, 4, 5, 6, 7 )
CHAPTER 2.0 SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT
2.1 Aesthetics (Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9 )
2.2 Air Quality
2.3
Agricultural Resources (Parts: 1, 2 )
2.4 Biological Resources
(Parts: 1, 2, 3, 4 )
2.5 Cultural Resources
2.6 Noise
2.7 Paleontological Resources
2.8 Transportation/Traffic
2.9 Hazards and Hazardous Materials
2.10 Geology and Soils
2.11 Utilities
2.12 Significant Irreversible Environmental
Changes Which Would be Involved in the Proposed
Project Should it be Implemented
CHAPTER 3.0 ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT
3.1 Effects Found Not Significant as Part of the EIR
Process
3.1.1 Global Greenhouse Gases
3.1.2 Energy
3.1.3 Hydrology and Water Quality
3.1.4 Land Use and Planning
3.1.5 Population and Housing
3.1.6 Recreation
3.1.7 Public Services
3.2 Effects Found Not Significant During Initial
Study
3.2.1 Mineral Resources
CHAPTER 4.0 PROJECT ALTERNATIVES (Parts: 1, 2, 3, 4 )
CHAPTER 5.0 LIST OF REFERENCES
CHAPTER 6.0 LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED
CHAPTER 7.0 LIST OF MITIGATION MEASURES AND PROJECT DESIGN FEATURES
TECHNICAL APPENDICES
(Bound in Separate Volumes Except
Appendices A and O)
A | Notice of Preparation (NOP) and Comments on the NOP (see below) | |
B | Visual Impact Analysis (Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 ) | |
C | Air Quality Analysis Report (Parts: 1, 2, 3, 4, 5, 6 ) | |
D | Agricultural Resources Report (Parts: 1, 2, 3, 4, 5, 6, 7 ) | |
E | Biological Technical Report (Pages: 1-8, 9-20, 21-26, 27-30, 31-36, 37-70 ) | |
Addendum 1 - Reservoir | ||
Appendices A - G, H | ||
F | Cultural Resources Inventory (Parts: 1, 2 3, 4, 5, 6, 7, 8, 9 ) | |
Addendum 1 - Reservoir | ||
Addendum 2 - Offsite Roads | ||
G | Acoustical Site Assessment Report (Parts: 1, 2, 3, 4 ) | |
H | Traffic Impact Analysis | |
I | Phase I and II Environmental Site Assessment (ESA) Central portion (Parts: 1, 2, 3, 4, 5, 6 ) | |
Phase I ESA - Neighborhood 5 (Parts: 1, 2, 3 ) | ||
Phase I ESA - Addendum Northern Parcel | ||
J | Greenhouse Gases Analyses Report (Parts: 1, 2, 3 ) | |
K | Geotechnical Investigations: Central Portion (Parts: 1, 2, Appendices, Neighborhood 5, Appendices ) | |
L | Fire Protection Plan (Parts: 1, 2, 3, Fuel Treatment Location Map ) | |
M | CEQA Drainage Study (Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9 ) | |
Hydromodification Management Study (Parts: 1, 2, 3, 4 ) | ||
N | Major Stormwater Management Plan | |
O | Project Facility Availability Forms | |
Updated Rincon Del Diablo
Municipal Water District Form Updated San Diego County Sanitation District Sewer Form | ||
P | Conceptual Water and Recycled Water Study | |
Q | Conceptual Sewer Study |
NOTICE OF PREPARATION
A Notice of Preparation (NOP) of an Environmental Impact Report (EIR) was distributed from June 20, 2013 to July 19, 2013. Click on the links below for all comments received by the Department.
Notice of Preparation
NOP Comments (Individuals)
NOP Comments (Agencies and Groups)
Initial Study